SW MOZ-SVOSVE is part of the design and build team responsible for the engineering design and rehabilitation of approximately 10 km of an existing 350mm diameter transmission main in Songo, including repairing of valves chambers and critical sections of a water treatment plant for HCB. An Environmental and Social Management Plan (ESMP) was also prepared for this project.